Central on Case St in Southport, a Master Builders award-winning Clarkes build we cleaned Photo: Clarkes
Builders cleaning · Gold Coast, QLD

Builders cleaning on the Gold Coast, ready for handover.

Rough, second and sparkle cleans for warehouses, industrial units, shops, offices and new homes. We plan each clean around your trades and your handover date.

Taking on new builders cleans. Call to check start dates.
10+
Years cleaning Gold Coast sites
7
Master Builders award winners cleaned
$20M
Public liability cover
Request a builders clean quote
SWMS included · White Card crews · No obligation
Details never shared

    Request sent. Thank you

    We’ll be in touch to confirm the clean stage, site access and SWMS requirements. Urgent? Call 0431 002 126.

    Send another request
    Builders clean
    clients include
    CLARKES McNAB HIPWOOD GROUP SYDNEY TOOLS
    Our services

    What each stage of a builders clean covers

    Most builders cleans run in three stages: rough, second and sparkle. Builders book one stage or all three, and most jobs are two or three visits.

    Phase 01

    Rough / first phase clean

    The first pass. It takes the bulk of the dust out so the detail stage starts clean.

    Every surface vacuumed · inside cabinetry · frames and tracks · wiped and mopped
    Phase 02

    Post-construction / second phase clean

    The detail stage. Paint, plaster, cement, glue and adhesive come off, and tiles are acid washed where needed. If pressure washing is in the job, it happens here or near the very end, so nothing new gets dirty.

    All internal surfaces · showers and toilets · cabinetry and sinks · glass and frames
    Phase 03

    Sparkle clean

    The final pass before handover, to a finished, spot-free standard. It isn’t a repeat of the first two.

    All internals vacuumed, wiped and mopped · spot-free finish
    Optional

    Pre-handover touch-up clean

    An extra clean before handover when trades return, defects are being closed out or the property needs one last pass before keys move.

    Defect dust · final marks · entry points · wet areas · high-touch areas
    Site support

    Site maintenance cleaning

    Regular cleaning for site lunch rooms, site offices, toilets and shared amenities so the project stays presentable and workable.

    Lunch rooms · offices · toilets · amenities · recurring site cleans
    Glass detail

    Construction window cleaning

    Construction glass cleaning for paint, silicone, stickers, plaster residue, cement marks, tracks, frames and elevated glass where access allows.

    Glass · tracks · frames · stickers · paint/cement marks · EWP where required
    Before and after

    What a construction window clean looks like

    Construction leaves glass caked in cement, silicone and paint. Drag the handle to see the difference on a real Gold Coast job.

    After photo of cleaned construction glass following a Gold Coast builders window clean After
    Before photo of construction residue on glass before a Gold Coast builders window clean Before
    Cement & builder grime
    Post-construction, as received
    Streak-free. Handover ready.
    CleansePro post-build window clean
    ← Drag to compare before and after →
    Our work

    Builds we’ve cleaned on the Gold Coast

    Builders cleans for Gold Coast builders and the businesses moving into their new buildings.

    Central on Case St in Southport, a Master Builders award-winning Clarkes build Photo: Clarkes
    A client since 2015
    CLARKES
    Gold Coast builder

    Seven Master Builders award winners

    We’ve cleaned the Clarkes office since 2015 without missing a clean, and we do the builders cleans on their projects. Seven of those builds won Master Builders Gold Coast awards:

    • The Seaway, Coomera
      2024 · Commercial / Industrial Building up to $5M
    • ABI Interiors, Carrara
      2024 · Commercial / Industrial Building $5M to $15M
    • ITM, Stapylton
      2023 · Commercial / Industrial Building $5M to $10M
    • Central on Case St, Southport
      2022 · Industrial Building up to $5M
    • Maritimo, Coomera
      2019 · Industrial Building over $5M
    • Tekno Auto Racing, Yatala
      2018 · Industrial Building up to $5M, Gold Coast and Queensland winner
    • Buildsafe head office, Arundel
      2016 · Commercial Building up to $5M

    Award details: Master Builders Queensland.

    Warehouses, Southport
    Central on Case St
    22 warehouses for Clarkes, cleaned during COVID: hundreds of glass panels, some at height, plus floor coating removed from tilt panel walls and bathroom tiles.
    Retail and trade stores
    Sydney Tools
    Builders cleans for all of the Sydney Tools stores on the Gold Coast.
    Commercial
    RACQ
    Builders clean of the new RACQ building, built by Clarkes.
    Southport
    Centro Concepts
    Builders clean of the Onyx building in Southport.
    Warehouses
    Hipwood Group
    Builders cleans across several Hipwood sites, including a new warehouse facility in Hope Island.
    Ongoing
    McNab
    Ongoing builders cleans for McNab across different sites.

    More builds with photos: The Vault 2.0, Inventory Court, The Range and Aero Defence, or see all 34 builds.

    How we work

    How a builders clean runs with us

    We quote each site on its stage, size, glass, access and handover date, and confirm it all with you before we start.

    1. 1
      Send us the site details
      The clean stage, handover date, size or plans, and any glass or height access. Photos help.
    2. 2
      We confirm the scope and quote
      We check access, power, water and where the trades will be, then send you the quote.
    3. 3
      Paperwork before day one
      Your site team gets our paperwork pack before we start, so induction is quick.
    4. 4
      On site
      We work around the trades and keep in touch with the site supervisor. If the job needs an EWP, we arrange it with licensed operators.
    5. 5
      Walkthrough and sign-off
      We walk the site with you, sign off the clean and send a completion report. We invoice when the job is done.
    Sent before we start

    Our paperwork pack

    Site-specific SWMS
    Certificate of currency ($20M public liability)
    White Card confirmations
    Police check confirmations
    Company capability statement
    Site inductions on request
    Need a final clean SWMS for your own crew? See the SWMS store. What a SWMS must cover: WorkSafe Queensland guidance.
    Planning the final clean

    What slows a final clean down, and how to avoid it

    From our own Gold Coast sites. Sort these early and the final clean happens once.

    01

    Trades coming back in behind the clean

    Painting, sanding, cutting and plumbing put dust back on finished surfaces. Book the final once trades are out, with a short punch list for anything left.

    02

    Finished toilets in use, boots still on

    Trades using clean bathrooms and walking boots through finished areas undo the work. Lock off finished toilets and set a boots-off rule.

    03

    Handover dates that move

    Going in too early means cleaning twice. Give us the real practical completion date and we’ll plan the stages back from it.

    04

    Cement splatter and hard-to-reach glass

    Cement on windows takes blades, the right chemicals and time, and high glass needs a lift. Tell us about both when you book.

    05

    Awnings and fins fitted after the clean

    If they’re going in front of windows, tell us before we start. We clean the glass first or come back once they’re fitted.

    06

    No clear time for the EWP

    We can’t run a lift where trades are working underneath. A clear window in the program saves a return visit.

    We keep in touch with the site supervisor the whole way, and we’re happy to sit in on toolbox talks.

    Service areas

    Builders cleans across the Gold Coast

    We do builders cleans right across the Gold Coast. We’ve also cleaned builds in Brisbane and Byron Bay.

    Gold Coast service area
    Site somewhere else? Call 0431 002 126 and we’ll tell you if we can do it.
    FAQ

    Builders cleaning questions answered

    Do you provide SWMS documentation for builders cleans?

    Yes. Every builders clean comes with a current Safe Work Method Statement prepared for the clean type and site, at no extra cost, in your inbox before the crew arrives.

    Do your cleaners hold a White Card?

    Yes. Everyone we put on a construction site holds a current White Card (general construction induction) and has a police check. We hold $20M public liability and send the certificate of currency before we start.

    Can you accommodate last-minute handover changes?

    Yes. Construction timelines shift, so call 0431 002 126 for urgent or moved handovers and we will check what we can do.

    What’s the difference between a rough clean and a handover clean?

    A rough clean is the first pass: every surface vacuumed, including inside cabinetry, frames and tracks, then wiped and mopped. A handover (sparkle) clean is the final pass, to a finished, spot-free standard before the keys are handed over.

    Do you clean both residential and commercial builds?

    Yes. Most of our builders cleans are warehouses, industrial units and commercial buildings. We also clean new homes, duplexes, townhouses and unit developments, and retail fit-outs.

    How quickly can you provide a quote?

    We respond as quickly as possible once we have the site details. For urgent handover changes, call 0431 002 126 so we can check availability, access and crew capacity.

    How much does a builders clean cost?

    It depends on the stage, the size of the build, how much glass and height access there is, and how much cement, paint and dust is left behind. We quote each job after seeing the plans, photos or the site.

    Ready to book?

    Send us the site details. We’ll quote the clean.

    Use the quote form or call. If a handover has moved or the job is urgent, call and we’ll check what we can do.

    Mon–Fri 7am–5:30pm · call about urgent jobs
    What to send for a quote
    Suburb or site address
    Clean stage and handover date
    Size, levels or plans
    Glass and height access
    SWMS or induction requirements